Library Renovations
The board provided funding to assist with the library renovations when they relocated from North Colony Blvd. to the City Hall building on Main Street. The money was used for furniture, shelving, filing cabinets, lockers, end panels, refrigerator, laminator, modular
furniture, and relocation expenses. The project was completed in
December 2001.


 


Friendship Park
ADA/ROW Sidewalk
An ADA sidewalk was built around the perimeter of the park so that people in wheelchairs could utilize the park. A wheelchair bound resident submitted a request to the Community Services Director who then approached the CDC Board for funding of the project. This was the first project the CDC Board completed. This project was completed in October 2000.


 

Friendship Park – ADA Compliant Fall Zone
New ADA compliant fall zone material was put in the playground area of the park. This project was completed in June 2001.





Ridgepointe Park – Phase I

A new neighborhood park, located at 4401 Standridge, was constructed in the Ridgepointe sub division. The park has playground equipment, a shade pavilion with picnic tables, and park benches. This project was completed in May 2001.




Outdoor Basketball Court

An outdoor basketball court was built between the
Recreation Center building and Kids Colony playground.
The court size is 90 ft. x 56 ft. This project was completed
in January 2002.






Lions Club – ADA/ROW Sidewalk

An ADA compliant sidewalk was built around the perimeter of the park and was completed in May 2002. A new irrigation system was added to the park in August 2002.



Perryman Park

Electricity was installed in the pavilion in May 2002. A new irrigation system was installed in December 2002. An ADA/ROW sidewalk was built in February 2003. New playground equipment was installed in April 2006.





Little League – Shade Structures

Shade structures were installed over the bleachers and the dugouts at the Little League Complex located on
North Colony Blvd. in July 2002.










Aquatic Park

A new party pavilion and shade structures were installed and new tables were also added. This project was completed in June 2002.

 

 

 

Stewart Creek Park – Courtesy Dock Extension
The courtesy dock at the Stewart Creek Park boat ramp was extended to 60 ft. in length. The extension was completed in December 2002.

ADA Campsite
An ADA campsite was built next to the
restrooms at Stewart Creek Park.
This project was completed in July 2003.



Skatepark

The skatepark is located behind the Recreation Center at 5151 North Colony Blvd. The park is constructed on a 76' x 74' concrete slab and is enclosed by an 8 ft. fence. Ramps and structures in the park are quarter pipe wedges, grinding rails, fun boxes, grinding benches
and a free style area. The park was completed in August, 2003.
There is no fee to use the park.

 





Five Star Complex

This was a vision that began in 1997 when the first Parks Master Plan was completed. In September, 2003, the first phase of the Five Star Complex was completed. The points of the star represent what the complex is about - Recreation, Community, Environment, Sports and Culture.

 

 

Scoreboards at Five Star Complex
Scoreboards were installed on the baseball and football fields.  They were installed in February, 2004.

 



Veteran’s Memorial
The Veteran's Memorial at Five Star was the idea of some local veterans. It is dedicated to the men and women who have served
or are serving in the United States Military. The veterans sold bricks that would be engraved with the name, rank and service branch of someone who has served or is currently serving in the military. The bricks are installed around the cenotaph.







Park Signage

In 2004, a uniform park signage project was completed.
Signs were installed in the 14 parks throughout the City identifying the park and the year it was established.

 






Hawaiian Falls Waterpark – Parking Lot

CDC Board provided funding to build the parking lot at Hawaiian Falls. There are approximately
400 parking spaces.




Trail Master Plan

A citywide Trail Master Plan has been developed so that a trail system can be built within the city limits and
to also have it connect to trail systems in other cities.
The trails will link neighborhoods, tie into Five Star
and Austin Ranch, and they will also run along
the 23 miles of shoreline. All trails will be ADA compliant.





Scout Park Pond Dredging / Aeration
Pond dredging and aeration were completed in May, 2004.

 

 


 

Scout Park Pavilions
A shade structure was installed in September, 2004
and the ROW/ADA sidewalk was completed
in December, 2004.

 

 

Bill Allen Memorial Park
Playground equipment was installed in September, 2004.

 

 

 

Dave Cowan Park
A shade pavilion with a picnic table was installed in September, 2004.



 

Carr / Chapman
Addition of a pavilion. Project was completed in Sept. 2004.


 

B.B. Owen Adult Softball Fields
Improvements were made to the dugout and spectator areas. A sidewalk was built from the parking lot to the fields. These improvements were completed in August, 2004.



 

Bill Allen Memorial Park,
B.B. Owen Adult Softball Fields, Slay/Baker,
Little League Complex
Addition of trees to each location.

 





Slay / Baker
Playground equipment and ADA compliant sidewalks were installed in July, 2005.


 