Hull Construction and Fiberglass Epoxy Sheathing


Photographs of the Exterior, hull construction, and fiberglass sheathing.



Hull flipped over bottom side up and being covered with fiberglass and epoxy. Then the skeg glued up from sections of Douglas fir is attached. Hull flipped right side up again. Outwales and carlins bent on to curve shape of hull. Foam flotation cut from 2" thick sheet to fill bow section forward of frame A and under side decks aft of frame E. Then deck assembly, installation, fiberglassing and finishing, including mast partner, mooring cleat and backing blocks for deck hardware. Finally the cockpit coammings are fit and installed. Followed by painting and rigging.