MTTV Home Page
Trolley Loop
Pole Yard
Track Yard
Lesson Learned
Second Half
Rail Bending
Loop Trackage
Pole Installation
Hanging Wire
Test Run - Page 1
Test Run - Page 2
|
Trolley Loop - Lesson Learned!
It would appear that we have decided to run a narrow guage operation
rather than the streetcar loop. The track crew thought it would be
easier to spike the outside rail first. It was quickly pointer out
that a single rail will bend more readily than two rails bolted together.
|
|
Another view of our lesson learned.
|
|
The problem has since been corrected. The guage is proper and the
Water Works #10 has been push part way around the loop and the guard
rail is working the way it should.
Here our track crew is using trackscrews to secure the inside
guard-rail to ties.
|
|
|