Trolley Loop - Loop Trackage
Looking eastbound we can see that the north side
approach track to the loop is nearing completetion.
Just a little more work trackwork, some ballasting and
it will be completed.
|
 |
 |
The westbound view shows how much work we really have
to complete. Well over 100 feet is still left to
install.
|
You win some and you lose some, and the rest get
rained out. Not everyday is a sunny day when you have
to work outside. This is one of those days that we got
to work on some our indoor projects. We did have the
for sight to put good drainage in before the tarck
work was started.
|
 |
 |
Here we see the "Track Gang" hard-at-work putting the
finishing touches on the track. They are spiking the
rail to the ties. Still a lot more to go but it
should not be to much longer.
|
When you can not find a piece of rail that is just the
right size you have to cut it to fit. A gas powered
rail cutter is just the right thing to help us out.
It is still a lot of work, but certainly easier than
doing it by hand!
|
 |
|